Magazines
How to set up recurring events, assign employees, and monitor log execution.
Machine translation
The logs help to organize regular work activities: cleaning, opening and closing the facility, checking equipment, rounds, temperature control and other repetitive procedures.
The manager sets up the schedule and the composition of actions once, and Synchra24 automatically creates events on the right dates, appoints employees and reminds them of the completion.
How does the magazine differ from the event?
The service uses two related concepts:
- Journal — the rule by which the work is repeated. It sets the period, schedule, employees, and a set of actions.
- Magazine event — a specific action for a specific date and time that the employee must perform.
For example, Открытие кофейни "It's a magazine, isn't it Проверить готовность зала 10 августа с 07:30 до 08:00 — a separate event of this magazine.
What are the logs for?
The service is suitable for processes that must be performed regularly and confirmed by employees.:
- morning and evening cleaning;
- opening or closing a point of sale;
- checkout verification;
- refrigerator temperature control;
- equipment inspection;
- indoor crawl;
- checking the sanitary condition;
- inventory of consumables;
- meeting regulations by day of the week;
- scheduled procedures
2/2,3/3or another cycle.
The journal is especially useful when it is important for the manager to see not only the schedule, but also the personal confirmation of each performer.
Where are the magazines located
An employee opens a service Журналы in his company.
Tabs are available on the main screen:
Сегодня— events for the current day;Предстоящие— events for the upcoming dates;Просроченные— actions that were not completed before the deadline.
A user with executive rights can also switch between the modes:
Мои— own events;Управление— control of employee activities.
In the web version, the manager has access to a list of unfinished events, history, search, sorting, and filters.
If the section is not displayed, check the company's license and the user's rights to view, execute, or manage logs.
How to create a magazine
A user with management rights can create and configure logs.
Step 1. Open the Logs setting
Go to log management and click create.
The form opens Новый журнал.
Step 2. Fill in the basic information
Specify:
- name of the magazine;
- description;
- start date;
- an optional end date.
The name should describe the entire repetitive process, not a single step.
Examples:
Открытие кофейни;Контроль оборудования;Ежедневная уборка кухни;Проверка складских остатков.
In the description it is better to fix the expected result and the general rules of execution.
Step 3. Set up a schedule
Choose the appropriate repetition method.
Every day
Use it for daily routines. If necessary, set an interval, for example, once every two or three days.
Cycle
Specify the number of working days and days off, as well as the first working day of the cycle.
This is how you can configure:
2/2;3/3;5/2;- any other cycle of working and inactive days.
By week
Select the days of the week and the repetition interval.
For example:
- Every Monday and Thursday;
- every two weeks on Fridays;
- every week on business days.
By month
You can launch events:
- on a specific day of the month;
- on the last calendar day;
- on a certain day of the week, for example, on the first Monday or the last Friday of the month;
- every few months.
Your dates
Select specific dates manually. This option is suitable for irregular inspections or a pre-determined plan.
Step 4. Add special dates
For a daily, cyclical, weekly, or monthly schedule, you can specify:
Дополнительные даты— events will be created outside the basic rule;Даты-исключения— there will be no events on these days.
The exception takes precedence. If one date is added and excluded at the same time, no event is created for it.
How to add events to the magazine
You can set up multiple actions per day in one log.
For example, the magazine Открытие кофейни may contain:
Проверить готовность зала— from 07:30 to 08:00.Запустить кофемашину— from 07:45 to 08:10.Проверить кассу— from 08:00 to 08:15.
Step 1. Click "Add Event"
For each action, specify:
- title;
- description of the expected result;
- start time;
- deadline.
If the deadline is earlier than the start, it applies to the following days. This way you can create night events lasting up to 24 hours.
Step 2. If necessary, link the checklist
You can add an existing checklist template to the event.
Options are available:
- The checklist is optional;
- Each performer must complete a mandatory checklist.;
- One completed checklist per event is enough to complete.
If the checklist is mandatory, the event cannot be completed until the completion condition is met.
Photos, comments, voice recordings, and other confirmations are saved as a result of completing the checklist.
Step 3. Select the event performers
By default, the event uses employees selected for the entire magazine.
If another group should perform a specific action, disable Использовать сотрудников журнала and choose your own performers.
Step 4. Save the event
After saving, the action will appear in the block Мероприятия дня. Add the rest of the necessary actions and check their time and order.
How employees are assigned
The list of candidate employees is set in the journal. If necessary, a separate event can have its own list.
The system takes into account the employee's work shift:
- Before the start of the event, he determines the candidates who have a working day scheduled.
- At the time of the start, it clarifies who is actually on shift.
- Captures the final list of performers.
Therefore, an employee from the magazine's list does not necessarily receive every event: he must fit the schedule and the actual shift.
If there are no suitable performers, the event gets the status Без исполнителей. The supervisor will see it in the control and will be able to assign the employee manually.
How to save and manage a journal
After filling in the schedule, events, and employees, click Сохранить журнал.
The log may have states:
- Active — the system creates new events according to the schedule;
- On pause — new events are temporarily not being created;
- In the archive — the magazine is no longer in use, but its history is preserved.
A pause is suitable for temporarily stopping the process. After resuming, new events are created again from the current date.
Archiving is irreversible. Before transferring to the archive, make sure that the journal is no longer needed.
The settings changes apply to future events. Events that have already been started, completed, overdue, and canceled remain the same.
How can an employee complete an event
Step 1. Open the appropriate tab
In the section Журналы choose Сегодня, Предстоящие or Просроченные.
The card shows:
- name of the action;
- the magazine it belongs to;
- date and time;
- deadline;
- location, if specified;
- availability of a mandatory checklist;
- current status.
Step 2. Open the event
Check the description and the expected result. If a checklist is attached, open it from the card.
Step 3. Complete the checklist
If the checklist is required, fill in the required items and send the result.
If the checklist is optional, you can go through it to fix the result, but it does not block completion.
Step 4. Complete the event
Click the finish button after actually completing the work.
If several employees are assigned to the event, each must confirm their own performance. The event is considered fully completed when all the active performers have completed it.
Do not mark the event as completed in advance. The confirmation is saved in the history and used by the supervisor for control.
What happens when the payment is overdue
If the deadline has passed and the event has not been completed, it gets the status Просрочено.
Overdue event:
- remains available to the employee;
- can be completed later;
- it is saved in the history with a note about being late.;
- it is displayed to the supervisor in the control.
It is better to complete the action even after the deadline than to leave it without a result.
How can a manager monitor the implementation of
Switch to the mode Управление.
In the tab Контроль displayed:
- active events;
- overdue;
- events without performers;
- progress of execution by employees.
In the tab История completed and cancelled events are available.
The supervisor can:
- search for events by name;
- filter them by log;
- select an employee for filtering;
- see who has completed the work and who is still expected.;
- add or remove a waiting artist;
- see overdue completions;
- check the passage of the checklist;
- cancel the event if it is no longer relevant.
When changing the list of performers, you must specify the reason. An employee who has already completed his appointment cannot be deleted.
How to complete an event for an employee
A user with a separate right to force termination can close an appointment for a specific employee.
This action is used only in exceptional cases, for example, if:
- The job is done, but the employee has lost access to the application.;
- the supervisor personally accepted the result at the facility;
- there was a technical problem with the confirmation.
To complete:
- Open the event in management mode.
- Find an employee with the status
Ожидает выполнения. - Click
Завершить. - Specify the required reason.
- Confirm the action.
The history will specify separately:
- that the appointment was completed by the head;
- who exactly performed the action;
- Completion time;
- reason.
Forced termination cannot be undone or overwritten. If the required checklist is not completed, the system will display a warning, and the checklist itself will not be automatically marked as completed.
Notifications
An employee may receive a notification:
- before the start of the event;
- at the final appointment;
- after the delay occurs;
- if the supervisor has completed the appointment for him.
The supervisor receives a notification if the performers have not been identified by the start of the event.
Clicking on the notification opens the corresponding event in the app.
Event statuses
Запланировано— the completion time has not yet arrived;Можно выполнить— the event is active;Без исполнителей— the system could not assign an employee;Просрочено— the deadline has passed, but the work is not completed;Завершено— all performers have confirmed the execution;Отменено— the event was canceled by the supervisor or the system.
A practical example
The supervisor creates a journal Ежедневное открытие магазина.
It performs the following actions:
- Selects the daily schedule.
- Specifies the start date.
- Adds an event
Проверить входную группуfrom 08:30 to 08:45. - Binds the required opening checklist.
- Adds an event
Проверить кассуfrom 08:45 to 09:00. - Selects candidate employees.
- Saves and activates the log.
In the morning, the system assigns actions to employees who are on shift. Each performer receives a notification, goes through their own checklist and completes the event. The supervisor sees the progress in the management mode and can open the progress history later.
Practical advice
- It is better to devote one magazine to one clear process.
- Divide a large schedule into several events with your own deadlines.
- Use a mandatory checklist where quality or safety confirmation is required.
- For a temporary stop, use a pause, not an archive.
- Check the events with the status
Без исполнителейso that actions are not left without a responsible person. - Please specify the reasons for the manual change and forced termination.
- Do not assign too wide a list of candidates unnecessarily.