Reports
How to create reports, attach materials, and keep a history of completed work.
Machine translation
Reports are needed to record completed work, shift results, inspections, and individual assignments.
What is the section for?
Through reports, an employee shows not just the fact of work, but its outcome.:
- What's done;
- for which day or shift;
- by which object or scenario;
- is there an explanation;
- is there any supporting material?
If it is important for the company not to lose the result of the work done, it is better to make a report in this section.
When is the report usually created?
Most often, a report is needed:
- after completing the shift;
- after leaving the facility;
- after completing the task;
- after checking the checklist;
- after the incident is resolved;
- when the supervisor asks to record the result in writing.
What is in the section
The user usually sees in the reports:
- list of reports that have already been created;
- date of creation;
- a card or report details;
- the button for creating a new report, if he has the right;
- the ability to open past materials.
How to create a report
Step 1. Open the section
First, the employee opens the report history and makes sure that the required report has not been created yet.
Step 2. Click Create a new report
If the employee has the appropriate right, he goes to the creation form.
Step 3. Fill in the content
Inside the form, you need to describe:
- What exactly has been done;
- what result was obtained;
- What's left unresolved, if it's important;
- are there any comments or conclusions.
If the report is intended for the manager, it is better to write it in such a way that it is already clear from one text what was happening without additional calls and clarifications.
Step 4. Decide what to link the report to
By default, the report is usually linked to the current session or the current work context.
If you need to issue a report for a different date, a separate date binding mode is used.
This is useful when:
- The report is not written every day.;
- We need to restore the result for the previous period.;
- the actual work was completed before the employee reached the form.
Step 5. Attach the materials
If the report needs to be confirmed, it is usually added:
- Photo;
- files;
- additional explanations.
Step 6. Send the report
After saving, the report appears in the list and becomes available for viewing.
How to use reports correctly
A good report should not consist of one general phrase like Все сделано.
It's much more useful when it has:
- specific action;
- result;
- The problem is if it remains;
- the next step is if the work is not fully completed.
How are the reports related to other services?
Reports are most often used together with:
- Tasks — if a written summary is needed for the task;
- Time control — if it is important to understand what was done during the working session;
- Checklists — if you need a final comment after completing the course;
- Incidents — if the report completes the analysis of the situation.
A practical example
If an employee has closed a shift at the facility, a good report may include:
- what has been verified;
- what works have been completed;
- Any comments left;
- photos of the result.
This way, the manager gets not just a job mark, but a clear picture of the day's results.